
The construction of the world’s largest permanent type drilling oil platform Berkut has been finished on the Arkutun-Dagi field on Russia’s Sakhalin shelf, ExxonMobil, the operator of the Sakhalin-1 project, said on Monday.
Berkut will be launched in December and produce up to 12,000 tonnes of oil daily. The platform is designed to operate in temperatures no lower than -44 degrees Celsius, with the wave height up to 18 meters and ice coverage up to two meters.
Sakhalin-1 is the oil and gas project which envisages the development of three fields - Chayvo, Odoptu and Arkutun-Dagi with the extractable reserves amounting to 2.3 billion barrels of oil and 485 billion cubic meters of natural gas. The project’s consortium has already invested $4.5 billion in the development of the project.
ExxonMobil is the Sakhlin-1 operator with a 30% stake. SODECO also owns 30% in the project, while Russian oil major Rosneft and ONGC hold 20% stakes each. The companies develop the Sakhalin-1 fields under a production sharing agreement.
GMT 14:36 2018 Sunday ,14 January
Fossil fuels blown away by wind in cost terms: studyGMT 18:20 2018 Thursday ,11 January
Ukraine to launch its first solar plant at ChernobylGMT 18:44 2018 Tuesday ,09 January
Finland's Fortum snaps up EON's fossil fuels stakeGMT 17:39 2018 Wednesday ,03 January
Norway powers ahead electrically with over half of new car sales now electric or hybridGMT 15:36 2018 Wednesday ,03 January
Minister of Mining Says Govt. Invested MAD 12.3 Billion between 2003-2017GMT 18:00 2017 Saturday ,23 December
Energy prices bump key US inflation index up in NovemberGMT 09:01 2017 Friday ,15 December
BP plan to buy Australian petrol pump network blockedGMT 14:54 2017 Monday ,27 November
Belarus nuclear power plant stirs fears in Lithuania
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©
Send your comments
Your comment as a visitor