High levels of radiation have been detected near suppression chambers of two of the reactors at the Fukushima Daiichi nuclear plant. The radiation levels are too high for workers to continue inspections, Japan's NHK website reported. Decommissioning the plant's crippled reactors involves filling the reactors and their containment vessels with water and extracting melted fuel. To do this, workers must pinpoint and repair damage to the containment vessels and the suppression chambers. On Wednesday, for the first time since the accident a year ago, Tokyo Electric Power Company sent workers to the basement of the No.2 and No.3 reactor buildings to examine the suppression chambers. A total of six employees entered. At the No.2 reactor building, workers opened the door to the suppression chamber and detected a maximum radiation of 160 millisieverts per hour. The door to the chamber at the No.3 reactor had been damaged and could not be opened. The maximum radiation outside the door was 75 millisieverts per hour.
GMT 13:29 2018 Monday ,01 January
Serbia launches probe after toxic waste dumped near BelgradeGMT 19:03 2017 Thursday ,28 December
Pregnant elephant 'poisoned' in Indonesian palm plantationGMT 16:26 2017 Sunday ,24 December
Nepal's two last known dancing bears rescued: officialsGMT 10:51 2017 Sunday ,24 December
Florida orange industry hit by hurricane, diseaseGMT 09:09 2017 Sunday ,24 December
Modern-day amber 'Klondikes' thrive in troubled UkraineGMT 19:23 2017 Saturday ,23 December
Indonesian pangolin faces extinction due to traffickingGMT 11:37 2017 Friday ,22 December
Global warming may boost asylum-seekers in Europe: studyGMT 07:32 2017 Friday ,22 December
Modern-day Mowgli: Indian toddler forges bond with monkeys
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©
Send your comments
Your comment as a visitor