total floor area of projects approved triples from previous quarter
Last Updated : GMT 09:03:51
Almaghrib Today, almaghrib today
Almaghrib Today, almaghrib today
Last Updated : GMT 09:03:51
Almaghrib Today, almaghrib today

Total floor area of projects approved triples from previous quarter

Almaghrib Today, almaghrib today

Almaghrib Today, almaghrib today Total floor area of projects approved triples from previous quarter

The total floor area of developments
Abu Dhabi - WAM

The total floor area of developments given the green light more than tripled in the second quarter of the year, according to figures released yesterday by the Abu Dhabi Urban Planning Council, UPC.

The UPC announced that 26 development projects spanning a total gross floor area (GFA) of 2,327,073 m2 were approved during Q2, compared with 708,999 m2 in the previous quarter. The number of projects given the go-ahead was up by just under 25% from the 21 approved in Q1.

On Abu Dhabi Island, a mixed-use tower development in a prime location facing the Abu Dhabi Corniche was approved. The development has been designed with a distinct lower five-storey podium that has three 24-storey towers emerging over it. The irregular L-shaped profile of the plot has enabled the three towers to be positioned diagonally so as to achieve maximum views of the Abu Dhabi Corniche from the high-end residential apartments, which will be housed in three towers from levels 2 to 24. Four basement levels and two podium levels will provide the overall parking required for the building, and the site is flanked by roads on two sides which provides valuable frontage for retail and commercial establishments.

Also on Abu Dhabi Island, two residential tower building projects were given the go-ahead. The first tower will have a GFA of 10,406 m2 over 24 storeys on a plot of 1,098 m2, while the second tower, similar in design to the first, will have a GFA of 12,508 m2 over 24 storeys on a plot size of 1,354 m2. The project design is a tower block rising from the surrounding environmental deck located on the podium roof, which will enable the apartment blocks to be elevated to have better surrounding views. Facade glazing has been reduced carefully to provide living and bedroom areas with plenty of natural light, and balconies projecting from the building also act as solar shading. Parking will be located in the basement and in the podiums.

Located on the Abu Dhabi Corniche, close to the Corniche Hospital, the Saraya residential tower, comprising 49 storeys and three basement floors for underground parking, was also approved.

On Abu Dhabi Mainland, the Burjeel Medical City project in Mohamed bin Zayed City, a 300-bed specialty hospital covering a GFA of almost 82,000m2, was approved. The development consists of a main hospital podium, with four towers, a basement floor and a rooftop with a helipad to provide helicopter access for urgent cases.

Also on Abu Dhabi Mainland, the Abu Dhabi University will see an expansion of the existing female student accommodation building where four typical floors will house 21 residential units and, once complete, the expansion will provide 93 additional residential units for female students at the university.

In Al Ain, the Remah Emirati Housing Stage 2 residential project, consisting of ten villas and including a mosque, was approved. The development has a total GFA of 5,350m2 and a maximum height of ten metres (two storeys).

In the Mirfa area of Al Gharbia, a mixed-use project comprising 186 residential units and commercial units was approved. The project includes 192 car park spaces and a well-designed courtyard for residents, and covers a total GFA of 15,252.86 m2.

In parallel, the UPC announced the number of Estidama Pearl Ratings that have been awarded in Q2 2015. The figures show that 1,017 villas have been awarded 2 Pearls, 41 buildings have been awarded a 1 Pearl Rating, and 22 buildings 2 Pearls, making the total number of Pearl Ratings for Q2 1,080. In addition, nine Estidama training sessions have been held with 567 trainees in attendance.

To date, the UPC's Urban Development has delivered 440 projects and master plans with a total GFA of 73.6 million m2. Since the Estidama Pearl Rating System was launched four years ago, the Estidama team has reviewed many projects – a total of 11,878 villas and 1,004 buildings have been awarded a Pearl Rating.

almaghribtoday
almaghribtoday

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

total floor area of projects approved triples from previous quarter total floor area of projects approved triples from previous quarter

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

total floor area of projects approved triples from previous quarter total floor area of projects approved triples from previous quarter

 



Almaghrib Today, almaghrib today Skincare PR Performance Full Year 2017

GMT 09:22 2018 Monday ,22 January

Skincare PR Performance Full Year 2017
Almaghrib Today, almaghrib today New hunt for flight MH370 gets under way

GMT 11:03 2018 Wednesday ,24 January

New hunt for flight MH370 gets under way
Almaghrib Today, almaghrib today Modern colorful bedroom renovation

GMT 10:57 2017 Thursday ,21 December

Modern colorful bedroom renovation
Almaghrib Today, almaghrib today Puigdemont candidate for Catalan president

GMT 13:56 2018 Tuesday ,23 January

Puigdemont candidate for Catalan president
Almaghrib Today, almaghrib today Turkey detains dozens more

GMT 10:47 2018 Wednesday ,24 January

Turkey detains dozens more

GMT 09:58 2016 Wednesday ,23 March

cartoon four

GMT 10:21 2016 Wednesday ,23 March

cartoon eleven

GMT 10:18 2016 Wednesday ,23 March

cartoon eight

GMT 09:57 2016 Wednesday ,23 March

cartoon two

GMT 10:16 2016 Wednesday ,23 March

cartoon five

GMT 10:19 2016 Wednesday ,23 March

cartoon nine

GMT 10:22 2016 Wednesday ,23 March

cartoon thirteen

GMT 10:24 2016 Wednesday ,23 March

cartoon fifteen

GMT 10:22 2016 Wednesday ,23 March

cartoon twelve

GMT 09:58 2016 Wednesday ,23 March

cartoon three

GMT 10:23 2016 Wednesday ,23 March

cartoon fourteen

GMT 10:17 2016 Wednesday ,23 March

cartoon six

GMT 09:56 2016 Wednesday ,23 March

cartoon one

GMT 10:20 2016 Wednesday ,23 March

cartoon ten

GMT 10:18 2016 Wednesday ,23 March

cartoon seven

GMT 14:19 2017 Monday ,09 January

UNEECO to showcase electronic security solutions

GMT 16:08 2017 Sunday ,05 February

UAE dealing with environmental issues

GMT 21:43 2017 Thursday ,30 November

November23rd-December21st
Almaghrib Today, almaghrib today
 
 Almaghrib Today Facebook,almaghrib today facebook  Almaghrib Today Twitter,almaghrib today twitter Almaghrib Today Rss,almaghrib today rss  Almaghrib Today Youtube,almaghrib today youtube  Almaghrib Today Youtube,almaghrib today youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

.almaghribtoday .almaghribtoday .almaghribtoday .almaghribtoday
almaghribtoday almaghribtoday almaghribtoday
almaghribtoday
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
almaghribtoday, Almaghribtoday, Almaghribtoday