Water pipeline project construction to link Turkey and Turkish Republic of Northern Cyprus (TRNC) has begun. The project envisaging the transfer of water from a dam which will be built on Turkish side, is estimated to cost 782.5 million TL. The pipelines will transfer water through a special method which will be applied for the first time in the world, as the pressure level in the deep-sea prevents the transfer of water through the pipes. The 80,151 meter-long pipeline will not transfer the water through channels in the deep-sea, but through the hangers only in 250-meter under the sea. The 75 million cubic meters of water will meet TRNC's 50 years of water need. While 50.3 percent of the water will be used for drinking, the rest will be used for irrigation. TRNC lacks water due to the nonexistence of adequate underground and surface water resources.
GMT 17:19 2018 Thursday ,11 January
China factory gate inflation slows to 13-month lowGMT 17:50 2018 Wednesday ,10 January
German industrial output rebounds in NovemberGMT 17:39 2018 Wednesday ,10 January
Samsung tips record Q4 operating profit of more than $14 bnGMT 17:29 2018 Tuesday ,09 January
German industrial orders dip in NovemberGMT 15:36 2018 Thursday ,04 January
China factory activity accelerated in December: CaixinGMT 13:33 2018 Wednesday ,03 January
Turkey inflation rate eases but still stubbornly high in DecemberGMT 16:27 2018 Monday ,01 January
China manufacturing activity slows in DecemberGMT 17:36 2017 Sunday ,31 December
Spain to leave EU's deficit 'sin bin' next year: Rajoy
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©
Send your comments
Your comment as a visitor